Shaft Sinking - Thyssen Mining Construction Canada https://www.thyssenmining.com local challenges | GLOBAL SOLUTIONS Thu, 21 Jul 2022 01:24:44 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 https://www.thyssenmining.com/wp-content/uploads/2021/08/Thyssen-Mining-Globe-small-LOGO-100x100.png Shaft Sinking - Thyssen Mining Construction Canada https://www.thyssenmining.com 32 32 Leeville Project (USA) https://www.thyssenmining.com/leeville-nevada-usa/?utm_source=rss&utm_medium=rss&utm_campaign=leeville-nevada-usa Mon, 18 Jan 2016 20:58:00 +0000 https://www.thyssenmining.com/?p=4921 In 2012 Thyssen Mining was awarded the contract for engineering and construction of the Newmont Leeville Ventilation Shaft No. 3, the first shaft sinking project in Nevada to employ ground freezing techniques.

The post Leeville Project (USA) first appeared on Thyssen Mining Construction Canada.

]]>
In 2012 Thyssen Mining was awarded the contract for engineering and construction of the Newmont Leeville Ventilation Shaft No. 3, the first shaft sinking project in Nevada to employ ground freezing techniques.

Client: AMEC Mining & Metals Americas

Date: March 2012 – January 2016

Project : Newmont Leeville Ventilation Shaft No. 3 (Nevada, USA)

The project, which included the design and construction of the ground freezing and temporary shaft sinking facilities, shaft development including concrete hydrostatic liner, installation of shaft furnishings, and construction of permanent surface and underground facilities, was completed on schedule in 2016.

luminor 1950

The post Leeville Project (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Husky Oil Well Recovery (CA) https://www.thyssenmining.com/husky-oil-well-recovery-canada/?utm_source=rss&utm_medium=rss&utm_campaign=husky-oil-well-recovery-canada Sat, 19 Dec 2015 01:56:00 +0000 https://www.thyssenmining.com/?p=4936 60 m deep freeze, 4.2 m diameter shaft x 7.2 m freeze circle.

The post Husky Oil Well Recovery (CA) first appeared on Thyssen Mining Construction Canada.

]]>
60 m deep freeze, 4.2 m diameter shaft x 7.2 m freeze circle.

Client: Husky Oil

Date: June 2015 – December 2015

Project : Husky Oil Well Recovery