Thyssen Mining Construction Canada https://www.thyssenmining.com local challenges | GLOBAL SOLUTIONS Sat, 21 Dec 2024 02:51:21 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 https://www.thyssenmining.com/wp-content/uploads/2021/08/Thyssen-Mining-Globe-small-LOGO-100x100.png Thyssen Mining Construction Canada https://www.thyssenmining.com 32 32 FERMILAB Project (USA) https://www.thyssenmining.com/lbnf-research-project-usa/?utm_source=rss&utm_medium=rss&utm_campaign=lbnf-research-project-usa Mon, 08 Aug 2022 17:35:37 +0000 https://www.thyssenmining.com/?p=5328 The FSCF Project is for the excavation and construction of the three caverns at the 4850 level and connecting drifts.

The post FERMILAB Project (USA) first appeared on Thyssen Mining Construction Canada.

]]>
KAJV & Fermi Research Alliance FSCF Excavation – Fermilab Long Baseline Neutrino Facility, Lead, SD. Far Site Conventional Facilities Project. Undergound excavation and underground infrastructure.

Client: Fermi Research Alliance (FRA)

Date: November 2020 – September 2024

The FSCF Project is for the excavation and construction of the three caverns at the 4850 level and connecting drifts. Two of the Caverns measure 500’ Long x 92’ Height x 65’ Width and the third cavern will measure 625’ Long x 36’ Height x 64’ Width. TMI will excavate about 800,000 tons of rock in the construction of the three caverns.

For more information on this project please visit the Fermilab LBNF project site here

A joint organization news release:  click here
Ore Pass Construction:  click here
Raisebore Completion:   click here

replica rolex deepsea

The post FERMILAB Project (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Goldrush Twin Declines- Cortez Mine Site (USA) https://www.thyssenmining.com/goldrush-twin-declines-cortez-mine-site-usa/?utm_source=rss&utm_medium=rss&utm_campaign=goldrush-twin-declines-cortez-mine-site-usa Thu, 21 Jul 2022 00:28:10 +0000 https://www.thyssenmining.com/?p=5294 Twin parallel declines were constructed to access a goldrush deposit.

The post Goldrush Twin Declines- Cortez Mine Site (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Thyssen Mining was the major contractor for the development of the Goldrush Twin Declines.  Twin parallel declines were constructed to access a new deposit.  Specifications called for two 18ft x 18ft modified arch profile drifts to be driven 62 feet apart for 13,000 feet each at a -3.7% decline.

Client: Nevada Gold Mines (NGM)

Date: July 2018 – December 2020

Project Scope: 3400ft concrete lined shaft, 24ft diameter

Project Location: Crescent Valley, Nevada

patekphilippe.io

The post Goldrush Twin Declines- Cortez Mine Site (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Turquoise Ridge Shaft #3 Project – Golconda, N (USA) https://www.thyssenmining.com/turquoise-ridge-shaft-3-project-usa/?utm_source=rss&utm_medium=rss&utm_campaign=turquoise-ridge-shaft-3-project-usa Wed, 20 Jul 2022 21:09:22 +0000 https://www.thyssenmining.com/?p=5285 3400ft concrete lined shaft, 24ft diameter.

The post Turquoise Ridge Shaft #3 Project – Golconda, N (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Thyssen Mining was awarded the contract to sink a 3,250’ shaft in Northern Nevada. The shaft will be concrete lined with a finished diameter of 24’. To facilitate this work, Thyssen Mining erected the headframe and a hoist house complete with foundations and full installation of three hoists. In addition to sinking the shaft, Thyssen Mining is responsible for the procurement, installation, and commissioning of all underground and surface material handling infrastructure.

Client: Nevada Gold Mines

Date : May 2018 to February 2023

Project Scope: 3400ft concrete lined shaft, 24ft diameter

Project Location: Nevada

perfect replica

The post Turquoise Ridge Shaft #3 Project – Golconda, N (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Jansen Final Liner Project (CA) https://www.thyssenmining.com/jansen-final-liner-project-thyssen-redpath-ledcor-trl/?utm_source=rss&utm_medium=rss&utm_campaign=jansen-final-liner-project-thyssen-redpath-ledcor-trl Wed, 20 Jul 2022 01:02:37 +0000 https://www.thyssenmining.com/?p=4787 The Jansen Final Liner Project is the construction and development of a shaft liner. As part of the TRL Partnership, Thyssen Mining will complete shaft liner activities in both shafts at the Jansen Potash Project.

The post Jansen Final Liner Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
The Jansen Final Liner Project is the construction and development of a shaft liner. As part of the TRL Partnership, Thyssen Mining will complete shaft liner activities in both shafts at the Jansen Potash Project.

This project includes the engineering and execution of the final concrete and steel shaft lining of the two 9m X 1,000m deep-frozen shafts.

Client: BHP Jansen Potash Project

Date: June 2017 to Present

Project Scope: Installation of two composite water tight liners, 1000m deep, 7.3m diameter

fake rolex for sale

The post Jansen Final Liner Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
Cigar Lake Project (CA) https://www.thyssenmining.com/cigar-lake-project-canada/?utm_source=rss&utm_medium=rss&utm_campaign=cigar-lake-project-canada Mon, 18 Jul 2022 16:22:39 +0000 https://www.thyssenmining.com/?p=4873 Mudjatik Thyssen Mining has completed a variety of projects at Cigar Lake Operations, such as shaft sinking, mine development and underground construction, as well as de-watering and mine remediation.

The post Cigar Lake Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
Mudjatik Thyssen Mining has completed a variety of projects at Cigar Lake Operations, such as shaft sinking, mine development and underground construction, as well as de-watering and mine remediation.

Client: Cameco Corporation

Date: May 2011 to Present

Project Scope: Mine Development & Support

Project Location: Saskatchewan

In addition to current mine development and support activities, recently completed projects include the ROMs storage facility (2011-2013, – 470 tons of structural steel, 265 tons of rebar, 4700 cubic yards of concrete) and outfitting of production tunnels which feed the UG ROMs storage and handling facilities. Mudjatik Thyssen Mining is a joint venture between Thyssen Mining and Mudjatik Enterprises; a joint venture of First Nations Bands and Métis communities. MTM is devoted to providing Northern Saskatchewan residents and communities the opportunity to participate in and benefit from Saskatchewan’s uranium industry.

perfect replica rolex gmt master ii

The post Cigar Lake Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
McArthur River Project (CA) https://www.thyssenmining.com/mcarthur-river-project-canada/?utm_source=rss&utm_medium=rss&utm_campaign=mcarthur-river-project-canada Sat, 18 Jun 2022 19:14:00 +0000 https://www.thyssenmining.com/?p=4887 For over 15 years Mudjatik Thyssen Mining has been the Contractor responsible for underground excavation and development to meet the long term operational needs and infrastructure requirements of the McArthur River Operation.

The post McArthur River Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
For over 15 years Mudjatik Thyssen Mining has been the Contractor responsible for underground excavation and development to meet the long term operational needs and infrastructure requirements of the McArthur River Operation.

Client: Cameco Corporation

Date: May 2011 – Present

Project : McArthur River Project (Canada)

In addition to underground development and construction, in 2015 MTM successfully completed on schedule the Zone 4 Freeze Distribution System Project and Shaft 2 Ventilation Increase Project. Mudjatik Thyssen Mining is a joint venture between Thyssen Mining and Mudjatik Enterprises; a joint venture of First Nations Bands and Métis communities. MTM is devoted to providing Northern Saskatchewan residents and communities the opportunity to participate in and benefit from Saskatchewan’s uranium industry.

The post McArthur River Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
K3 Potash Project (CA) https://www.thyssenmining.com/k3-potash-project-esterhazy-sk/?utm_source=rss&utm_medium=rss&utm_campaign=k3-potash-project-esterhazy-sk Fri, 20 May 2022 02:37:32 +0000 https://www.thyssenmining.com/?p=4810 K3 Potash Project consists of several underground construction projects. Work includes the initial offshaft cutting, shaft steel installations, shop and service construction, conveyor installations and raise bore work.

The post K3 Potash Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
K3 Potash Project consists of several underground construction projects. Work includes the initial offshaft cutting, shaft steel installations, shop and service construction, conveyor installations and raise bore work.

Client: The Mosaic Company

Date: June 2017 – September 2021

Project Scope: Off shaft development and conveyor installation

Project Location: Saskatchewan

https://www.patekphilippe.io/

The post K3 Potash Project (CA) first appeared on Thyssen Mining Construction Canada.

]]>
Marathon’s Robinson Butane Storage Cavern (USA) https://www.thyssenmining.com/marathons-robinson-butane-storage-cavern-usa/?utm_source=rss&utm_medium=rss&utm_campaign=marathons-robinson-butane-storage-cavern-usa Thu, 18 May 2017 20:06:00 +0000 https://www.thyssenmining.com/?p=4898 Excavation of 1M barrel underground cavern for storage of liquid butane.

The post Marathon’s Robinson Butane Storage Cavern (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Excavation of 1M barrel underground cavern for storage of liquid butane.

Client: PB Energy Storage Service

Date: January 2015 – June 2017

Project : Marathon’s Robinson Butane Storage Cavern

Project Location: Robinson, Illinois

In 2011 Thyssen Mining was selected to complete an underground excavation to store liquid butane, with the capacity to store 1 million barrels. After completing this excavation under budget and before schedule, Thyssen Mining was then chosen to excavate a second butane storage cavern with a capacity of 1.4 million barrels. The project completed ahead of schedule and under budget once again.

https://www.replicarolex.to/

The post Marathon’s Robinson Butane Storage Cavern (USA) first appeared on Thyssen Mining Construction Canada.

]]>
Eagle Point (CA) https://www.thyssenmining.com/eagle-point-canada/?utm_source=rss&utm_medium=rss&utm_campaign=eagle-point-canada Mon, 19 Sep 2016 02:03:00 +0000 https://www.thyssenmining.com/?p=4940 Labor only. Underground development, production and construction.

The post Eagle Point (CA) first appeared on Thyssen Mining Construction Canada.

]]>
Labor only.  Underground development, production and construction.

Client: Cameco Corporation

Date: May 2011 – September 2016

Project : Eagle Point (Canada)

Project Location: Saskatchewan

replica patek philippe gondolo

The post Eagle Point (CA) first appeared on Thyssen Mining Construction Canada.

]]>
Leeville Project (USA) https://www.thyssenmining.com/leeville-nevada-usa/?utm_source=rss&utm_medium=rss&utm_campaign=leeville-nevada-usa Mon, 18 Jan 2016 20:58:00 +0000 https://www.thyssenmining.com/?p=4921 In 2012 Thyssen Mining was awarded the contract for engineering and construction of the Newmont Leeville Ventilation Shaft No. 3, the first shaft sinking project in Nevada to employ ground freezing techniques.

The post Leeville Project (USA) first appeared on Thyssen Mining Construction Canada.

]]>
In 2012 Thyssen Mining was awarded the contract for engineering and construction of the Newmont Leeville Ventilation Shaft No. 3, the first shaft sinking project in Nevada to employ ground freezing techniques.

Client: AMEC Mining & Metals Americas

Date: March 2012 – January 2016

Project : Newmont Leeville Ventilation Shaft No. 3 (Nevada, USA)

The project, which included the design and construction of the ground freezing and temporary shaft sinking facilities, shaft development including concrete hydrostatic liner, installation of shaft furnishings, and construction of permanent surface and underground facilities, was completed on schedule in 2016.